NSB01102017 Meeting Notes

From Eugene Maker Space
Jump to navigation Jump to search

Near Space Balloon Meeting Minutes for January 10th 2017

  • Get all vehicles transmitting APRS
  • We need multiple tracking stations
    • Pair people up as Drivers and Navigators / Trackers
  • Tracking practice run
  • Isolated tracking system
  • Power bus
  • Set deadlines for testing, but not for actual launch
  • Test checklist
    • What kinds of tests to run?
  • Weston interested in using a Pi Zero for the main computer
  • Weston is interested in building a USB hub that can switch power on/off per port
  • Eclipse
    • Take lots of photos
    • Camera with filter that can photograph the sun
    • Jeffrey wants to know what kind of high frame rate cameras were used in the video linked below.
    • RF Scanner to record radio interference from the sun
    • Have a camera always pointing at the sun with HD
      • Ben has a Gimbel
    • Aug 21, 11:21AM is the maximum period (Monday)
    • Find another airstrip at the edge of the sun path
      • Clif suggested Pineville as a possibility with better ones forthcoming.
    • Research eclipse for more ideas
    • Solar panel? - Dileep's sensor board
  • Shut down all systems other than periodic transmission to help conserve power for emergency location
  • An earlier launch to practice and test before the eclipse
    • June 3 target
    • May 1 - deadline for first test
  • January 24 next meeting

Links:

--
-- Main.ClifCox - 11 Jan 2017